IDOT suspends non-emergency lane closures for Thanksgiving weekend
written by Updated November 24, 2026

Illinois drivers setting out for Thanksgiving will find many construction lanes on state highways open again from Wednesday afternoon through Sunday night, though work zones from Chicago to the Ohio River will still narrow traffic.
Starting at 3 p.m. on Wednesday, Nov. 25, and lasting until 11:59 p.m. on Sunday, Nov. 29, the Illinois Department of Transportation is holding off on lane closures that aren't emergencies, the department said in its holiday travel announcement.
Lanes shut for construction will reopen "where possible," IDOT said, a step meant "to minimize travel disruption" over the long weekend.
Not every work zone clears.
Some lane closures stay in place through the holiday, and IDOT warned that "the public can expect delays and should allow extra time for trips through these areas."
In Chicago, Foster Avenue stays closed where it crosses the Kennedy Expressway (I-90/94), and so does the ramp from westbound Foster to the outbound Kennedy.
Will County drivers face two stretches of work. On I-80 between River Road in Shorewood and Wheeler Avenue in Joliet, every shoulder remains closed and lane shifts continue.
Northbound I-55 keeps reduced lanes and both shoulders closed for the last mile before it meets I-80.
On the Bishop Ford Freeway (I-94) in Cook County, lanes stay reduced between 130th and 159th streets.
Downstate, lane reductions remain on eastbound War Memorial Drive (U.S. 150) at Adams Street in Peoria and on I-72 in Champaign.
Southern Illinois travelers will meet narrowed lanes on I-55/70 between East St. Louis and the Collinsville area in St. Clair County, on I-57 at the Missouri line in Alexander County and on I-24 over the Ohio River in Massac County.
IDOT urged drivers in work zones to watch for changed conditions and signs, keep to posted speed limits, stay off mobile devices and look out for workers and equipment.
"At all times, please buckle up and drive sober," the department said.
Construction details for each area are posted on the traveler information map at GettingAroundIllinois.com.
Under Rebuild Illinois, the state's $33.2 billion transportation program, IDOT's six-year plan covers 7,107 lane miles of road and bridge decks totaling 8.4 million square feet.





