Skip to content
News

I-74 drivers in Moline face overnight lane closures and 20-minute stops Nov. 22-23

written by Updated November 21, 2026

Cars drive along an elevated Interstate 74 in Moline under a clear blue sky, with light poles and a bridge ahead.
Photo: Farragutful / Wikimedia Commons (CC BY-SA 4.0)

Drivers on Interstate 74 in Moline will hit overnight lane closures and repeated 20-minute traffic stops on Sunday and Monday nights as crews take down overhead sign structures near the John Deere Road interchange.

Eastbound lanes go first, closing from 7 p.m. Sunday, Nov. 22, until 6 a.m. Monday. Westbound traffic gets its turn from 7 p.m. Monday, Nov. 23, until 6 a.m. Tuesday, Nov. 24.

Between 11 p.m. and 4 a.m. both nights, crews plan to bring traffic to a full halt several times, 20 minutes at a stretch, so the work can go ahead.

The Illinois Department of Transportation laid out the schedule in an announcement of the closures and said it hinges on the weather.

"Motorists can expect delays and should allow extra time for trips through this area and be prepared for slow and stopped traffic," IDOT said.

Drivers who can skip the stretch were pointed elsewhere. "To avoid the work area, when feasible, use of alternate routes should be considered," the department said.

Those who do go through were urged to watch for new signs and shifting conditions, keep to posted speed limits, stay off their phones and look out for workers and equipment.

Taking down the signs clears the way for a much bigger job. In 2027, the I-74 and John Deere Road interchange is set to be rebuilt, and the interstate widened from four lanes to six between a point south of 27th Street and the north side of the Rock River.

John Deere Road, which carries Illinois 5, will grow from four lanes to six as well, between 16th and 38th streets.

Both nights of work fall under Rebuild Illinois, a program investing $33.2 billion in transportation.

IDOT District 2 posts updates on X at @IDOTDistrict2, and road conditions show up on the traveler information map at GettingAroundIllinois.com.

Crews are expected to wrap up the preparation work by the end of the year, the department said.